Sunshine Panel Greenhouse Construction Steps

Jan 26, 2021

Leave a message

1 Buried the ground anchor wire on the top of the back wall

Pull a vinegar wire in the east-west direction in the middle of the top of the back wall, and anchor the ground

2 install the steel frame

Several people are required to pull the steel frame to the predetermined position reasonably or mechanically. Then, one person fixes the steel frame to the concrete top ring beam on the top of the rear wall to prevent it from falling down, and the other person fixes the steel frame to the bottom corner of the front roof. On the concrete low ring beam, the vertical direction of the steel frame should be corrected at the same time. The upper and lower welding points are required to align with the pillars under the back slope of the solar panel greenhouse. The back slope is supported by the skeleton extending to the back wall. Most of the back slopes are covered with insulation materials such as grass thatch and covered with cold soil. The back slope material itself lacks rigidity, so in order to increase the bearing capacity of the frame on the back slope. It can be used to fix multiple longitudinal 5-8 cm on the upper chord of the skeleton under the back slope, and bind and fix the longitudinal steel wire with the upper chord of the skeleton with thin iron wires.


Send Inquiry